enLanguage

KNOWLEDGE

RH roots blower alignment

Jan 13, 2021Leave a message

RH roots blower alignment

RH Blower direct coupling type.jpg

When unit and driver are factory mounted on a common baseplate, the assembly will have been properly aligned and is to be treated as a unit for leveling purposes.Satisfactory installation can be obtained by setting the baseplate on a concrete slab that is rigid and free of vibration,and leveling the top of the base carefully in two directions so that it is free of twist. The slab must be provided with suitable

anchor bolts. The use of grouting under and partly inside the leveled and shimmed base is recommended.


It is possible for a base-mounted assembly to become twisted during shipment, thus disturbing the original alignment. For this reason, make the following checks after the base has been leveled and bolted down. Disconnect the drive and rotate the unit shaft by hand. It should turn freely at all points. Loosen the unit foot hold-down screws and determine whether all feet are evenly in contact with the base. If not, insert shims as required and again check for free impeller rotation. Finally, if unit is direct coupled to the driver, check shaft and coupling alignment carefully and make any necessary corrections.


Send Inquiry

whatsapp

Phone

E-mail

Inquiry